Wednesday, January 17, 2018

Monday, January 8, 2018

design and build cases

project consists of 

sofa design and build 
wardrobe design and build 
bedhead and frame design and build 
steel + wood study room 







Sunday, January 7, 2018

commercial project handover within 2.5 months

interior design and build project consists of 

Tiling and wetwork
vinyl flooring
painting 
plaster ceiling and partition
lighting and electrical 
air-conditioning and ventilation
boiler heater and rain shower
wall panelling 
cabinet and furniture 
titanium stainless steel panelling and finishing
laser cutting
acrylic lighting product display
gold plated trim
brass and light box signage
glass doors
sliding doors 
stainless steel door frame
cctv and PA system 
marble and solid surface